keeporeo.blogg.se

Omniplan scheduling
Omniplan scheduling





omniplan scheduling

Constraint that this task must start no earlier than the given date, if any.The amount of time that resource leveling needs to delay this task beyond when it could otherwise be scheduled.if the task is already locked or otherwise already scheduled at an appropriate date.) May be missing if resource leveling isn’t needed to place this task. The date that resource leveling has determined that this task ought to be scheduled at.How this task should react when resources are assigned to it.ResourceAssignmentType ( ResourceAssignmentType) The higher the priority, the sooner leveling will attempt to schedule the task. Priority of this task during resource leveling.Dependencies where this task is the dependent task.Prerequisites ( Array of Dependency r/o) Three-point estimation minimum effort estimate in person-seconds.Three-point estimation maximum effort estimate in person-seconds.(Dropped in OmniPlan 4.x) Locked start date of this task, if any.(Dropped in OmniPlan 4.x) Locked end date of this task, if any.Tasks which are set to be scheduled manually will use the start and end dates you provide OmniPlan will not attempt to automatically reschedule them.

OMNIPLAN SCHEDULING MANUAL

  • (OmniPlan 4.x) Manual start date of this task, if any.
  • (OmniPlan 4.x) Manual end date of this task, if any.
  • Free slack (or float) is how much time a task can be delayed before any other connected task is effected.
  • Three-point estimation expected effort estimate in person-seconds.įreeSlack ( Number r/o).
  • Constraint that this task must end no later than the given date, if any.ĮxpectedEffortEstimate ( Number).
  • Constraint that this task must end no earlier than the given date, if any.ĮndNoLaterThanDate ( Date or null).
  • Scheduled end date.ĮndNoEarlierThanDate ( Date or null).
  • Effort remaining until completion of this task in person-seconds.ĮndDate ( Date r/o).
  • Effort already accomplished upon this task in person-seconds.ĮffortRemaining ( Number).
  • Total effort needed to complete this task in person-seconds.ĮffortDone ( Number).
  • Duration of the task.Įffort ( Number).
  • Dependencies where this task is the prerequisite task.ĭuration ( Duration).
  • Earliest that this task could start without effecting any other connected task.ĭependents ( Array of Dependency).
  • Latest that this task could end without effecting any other connected task.ĬurrentStartLimit ( Date r/o).
  • omniplan scheduling

    The cost of assigned resources to this task (per use and per hour costs).ĬurrentEndLimit ( Date r/o).Resources assigned to this task.ĪssignmentsCost ( Number r/o).Earliest that this task could start without effecting the overall start or end of the project.Īssignments (Array of Assignment r/o).Latest that this task could end without effecting the overall start or end of the project.ĪbsoluteStartLimit ( Date r/o).(Manual task scheduling replaces the “locked” task date functionality offered by previous OmniPlan versions.)ĪbsoluteEndLimit ( Date r/o) NOTE: In OmniPlan 4.x, tasks now support manual scheduling. NOTE: In the properties list shown below r/o indicates a property whose value is “read-only” or can only be read, not changed by the script. Instance PropertiesĪs with most scriptable objects, instances of the Task class have properties that define their abilities and usage. Each task has attributes such as start and end dates, a completion percentage, and resource assignments. A Task is an element of a Scenario, and is anything that needs to get done in order for the project to move toward completion.







    Omniplan scheduling